Project Case Study

Heathgate Resources Beverley Uranium Mine Plant upgrade and trunk line to four mile west

The scope of work consists of the provision of services to install two parallel trunklines inclusive of road crossings, creek crossings and midline valve stations.

The trunkline corridor extends 12km from the Beverley Plant to Four Mile West of DN400 HDPE to total 24km of trunk line in pipe work

The plant upgrade project includes the installation of 10 IX Columns (pressure vessels) into the Beverley Plant including all structural/mechanical/piping connections needed to operate the new
Currently the works is to be installed in three phases.